Routine Safety Audits
Full walk-through of every component against current ASTM F1487 and CPSC guidelines, with each item photographed and coded by severity.
$450


One clear photo and note from each site we inspect that day β the broken shackle, the low mulch depth, the protrusion that failed the gauge. Posted same afternoon, no filter.
If the report is incomplete, the exposure stays open. That is the entire service.
Full walk-through of every component against current ASTM F1487 and CPSC guidelines, with each item photographed and coded by severity.
$450
Detailed written certification suitable for insurance carriers and risk managers, including equipment inventory and corrective-action list.
$650
Depth, compaction and fall-attenuation measurements of engineered wood fiber, rubber mulch or poured-in-place surfacing at required intervals.
$350
Laser-measured fall zones and use zones plotted against current standards, with diagram and photo documentation for the file.
$550
Torque check of all fasteners, swing hangers, S-hooks and cable terminations plus replacement parts list with current manufacturer SKUs.
$400
Re-inspection after maintenance or replacement to confirm the work meets spec before the area is reopened to children.
$300
Playgrounds across the metro and surrounding counties. Every image is taken during an active inspection.







Play Safe was started in 2016 by a former municipal risk manager who saw too many incomplete inspection files during claims reviews. We still use the same checklist and camera protocol on every job because the document has to stand alone when the call comes in.
Most of our clients are school districts and park departments that need a defensible record rather than a sales pitch. The photos and measurements are taken on site; the report is delivered within forty-eight hours.
β Lena Torres, Play Safe

Four details that determine whether an inspection file holds up or creates new exposure.
Every item is checked against the current ASTM and CPSC language in force on the date of inspection.
No finding is logged without a timestamped image that shows the gauge, tape or probe in the same frame.
Reports are formatted for direct upload to carrier portals and include equipment serial numbers and manufacturer references.
Corrective-action deadlines are listed with the original inspection date so the timeline is never in dispute.
Schools, parks or multi-family sites that need current documentation for insurance or risk management. Send the location and we will confirm availability within one business day.
Call or text with the number of play structures and surface type. If the site is outside our normal service area we will say so before quoting.